- Joined
- Jul 16, 2001
- Messages
- 3,249
- Location
- El Sobrante, Ca. 94803
Dear friends,
I am indeed going to bite the bullet and have a short run of Keihin FCR 41 jet kits manufactured for Husaberg application. Since I am placing the minimum quantity order of 100 pieces said order will not be a priority with the manufacturer consequently we are realistically looking @ a minimum lead time of 45 days.
Said kit will be based upon the final field testing results provided courtesy of our own JOEUSA. http://www.husaberg.org/modules.php?nam ... pic&t=1334
Sincerely,
Dale
Ps
A word of thanks to Joe as he has been very supportive. His attention to detail, professional insight and unbiased opinion is a tremendous asset.
I am indeed going to bite the bullet and have a short run of Keihin FCR 41 jet kits manufactured for Husaberg application. Since I am placing the minimum quantity order of 100 pieces said order will not be a priority with the manufacturer consequently we are realistically looking @ a minimum lead time of 45 days.
Said kit will be based upon the final field testing results provided courtesy of our own JOEUSA. http://www.husaberg.org/modules.php?nam ... pic&t=1334
Sincerely,
Dale
Ps
A word of thanks to Joe as he has been very supportive. His attention to detail, professional insight and unbiased opinion is a tremendous asset.