Husaberg
Go Back   Husaberg Forum > Buy and Sell > Marketplace

Marketplace Business products, services, events, specials, sales


View Poll Results: Who wants one?
Yes 1 88 88.00%
Yes more than 1 12 12.00%
Voters: 100. You may not vote on this poll

Reply
 
LinkBack Thread Tools Display Modes
November 30th, 2009, 02:41 PM   #31
Member
 
Joined: Nov 2009
From:

Posts: 56
Thanks: 0

I Ride:
You got that right.
husky123 is offline  
 
December 3rd, 2009, 09:54 PM   #32
Moderator
 
Joined: Oct 2002
From: Sunland, CA

Posts: 3,116
Thanks: 8

I Ride:
Okay,

So here is the latest on the time line for the delivery date on the sub frame tanks is 2 months at the earliest and 4 months at the latest. I will post again when we have a more definite delivery time.

Our website for Seventy Degree Racing is 99.9% complete. As soon as we have the website completed with a rendition of the tank and the plumbing we will start taking pre orders via paypal.
DaleEO is offline  
December 4th, 2009, 06:38 AM   #33
Senior Member
 
Joined: Dec 2006
From: Los Alamos, NM

Posts: 160
Thanks: 0

I Ride:
Will we get to see some photos or specs first?
Hair is offline  
December 4th, 2009, 07:22 AM   #34
Moderator
 
Joined: Oct 2002
From: Sunland, CA

Posts: 3,116
Thanks: 8

I Ride:
Originally Posted by Hair
Will we get to see some photos or specs first?
Yes
DaleEO is offline  
December 4th, 2009, 11:12 AM   #35
Senior Member
 
Joined: Jan 2006
From: gunnison co

Posts: 194
Thanks: 0

I Ride:
My ex girl friend want's one of these in Pink. Do you think that would be a possibility?
kadlec is offline  
December 4th, 2009, 01:08 PM   #36
Moderator
 
berger's Avatar
 
Joined: Apr 2002
From: Phoenix Arizona

Posts: 3,145
Thanks: 9

I Ride: the pine
Possible that they can make a subframe in pink, or that you have an ex-girlfriend?
One would definately be more likely than the other
berger is offline  
December 4th, 2009, 04:12 PM   #37
Moderator
 
Joined: Oct 2002
From: Sunland, CA

Posts: 3,116
Thanks: 8

I Ride:
Another update, this one is more substantial............


We expect to take delivery of the first tanks at Seventy Degree Racing the first week of February. Which should translate into a first shipping date of the second or third week of that month. We are hopeful that we can ship the second week of Feb.

The tank material is going to be the same as stock, XLPE or cross linked polyethylene, and will be "natural" in color for easy viewing of the fuel level.

The stock hand grab area is going to be eliminated and used for fuel storage. I figure that there is probably at least .75 liters worth there. With the exception of a small area for the seat release. Capacity is expected to be 1.1 gallons. Further, we plan to make accommodations for the mounting of a "hand grab strap" across the rear of the seat to give the bike a good grab point.

The plumbing between the stock tank and the sub frame tank is going to be with a high quality fuel line with a quick disconnect that shuts off on both sides when it is decoupled.

To attach the fuel line from the sub tank to the main tank, as part of the kit, we will include a machined aluminum plate that will take the place of the stock plastic fuel pump holder plate that is on the bottom of the tank, that will have the fuel line connection on it.

The sub tank will also have it's own fuel cap for faster fueling.

As far as "assembly" goes. When you receive your kit all you will have to do is remove those items currently attached to your sub frame. Set the battery aside and let the wiring loom hang. Change out the bottom fuel pump mounting plate on the stock tank, then mount the battery and wiring loom to the new sub frame, couple the fuel line connector, and button everything up. The fuel lines will already be installed on the sub tank, and the adapter plate. Shouldn't take more than 1 hour at the most, and a 1/2 hour if you are acquainted with your bike.

We have made every effort to produce a product that is of the highest quality, that will be on par with the rest of the bike.

So there you have it! As soon as I have a rendition of the tank I will post it.

Fritz, I'm sure we can make one in pink for you if you have to have it .
DaleEO is offline  
December 5th, 2009, 10:34 AM   #38
JW
Senior Member
 
Joined: Jan 2008
From: Netherlands

Posts: 127
Thanks: 0

I Ride:
I even like just reading about it
JW is offline  
December 5th, 2009, 06:36 PM   #39
06z
Member
 
Joined: Jun 2009
From: Temecula, Ca

Posts: 57
Thanks: 0

I Ride:
I cant wait for it. Thanks for the update!
06z is offline  
December 19th, 2009, 02:24 AM   #40
Junior Member
 
Joined: Sep 2009
From: Singleton, NSW, Australia

Posts: 5
Thanks: 0

I Ride:
Come on, need more fuel capacity now!!!!
Rip'n'Shred is offline  
Reply

  Husaberg Forum > Buy and Sell > Marketplace

Tags
frame, fuel, replacement, tank, works



Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Modification of sub-frame as auxiliary tank. gjws Fuel 2 June 12th, 2013 03:14 PM
570 Adventure bike with an in frame oil tank moparmiller Husaberg 2 August 7th, 2011 08:59 PM
Replacement fuel injector Serpexc Fuel 1 September 22nd, 2010 08:31 PM
updating my fe400 tank plastics frame 97 sebbo Tech 0 October 10th, 2009 02:15 AM
works tank? bergiebearlike Fuel 3 December 13th, 2008 10:52 PM


Facebook Twitter Google+ RSS Feed